Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Al-Bataineh, M, AbouRizk, S and Parkis, H (2013) Using Simulation to Plan Tunnel Construction. Journal of Construction Engineering and Management, 139(05), 564–71.

Ammar, M, Zayed, T and Moselhi, O (2013) Fuzzy-Based Life-Cycle Cost Model for Decision Making under Subjectivity. Journal of Construction Engineering and Management, 139(05), 556–63.

Aquere, A L, Dinis-Carvalho, J and Lima, R M (2013) Project Cell: Cellular Organization of the Building Design Process. Journal of Construction Engineering and Management, 139(05), 538–46.

Arnold, P and Javernick-Will, A (2013) Projectwide Access: Key to Effective Implementation of Construction Project Management Software Systems. Journal of Construction Engineering and Management, 139(05), 510–8.

  • Type: Journal Article
  • Keywords: Information technology (IT); Communication; Information management; Project management; Computer software; Information technology (IT); Information and communication technology (ICT); Information management; Project management software;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000596
  • Abstract:
    Construction engineering and management experts asserted in the 1980s that computer-based information and communication technologies (ICTs) would grow quickly to increase the efficiency of communications in the architecture, engineering, and construction (AEC) industry. Since that time, many studies have measured the rate of adoption and effectiveness of these tools. Recently, studies have noted that these tools are not being used ubiquitously and have yet to reach their full potential in increasing the efficiency of intercompany communications. The present research employed the Delphi method with a panel of AEC industry professionals to address barriers and facilitators of using project-based project management software systems (PMSS), including issues of access to PMSS and how project-based access would affect the efficiency with which information can be communicated. The results of this research indicate that data reentry is a common source of inefficiency in the use of PMSS and that future construction ICT developments should focus on implementing a more collaborative, project-based PMSS that allows direct and active access to the PMSS by all project team members. However, governance issues may be preventing more widespread use of a collaborative PMSS implementation model. Specifically, the respondents felt that general contractors should maintain their roles as managers and controllers of the PMSS.

Goh, C S, Abdul-Rahman, H and Abdul Samad, Z (2013) Applying Risk Management Workshop for a Public Construction Project: Case Study. Journal of Construction Engineering and Management, 139(05), 572–80.

Holt, G D and Edwards, D J (2013) Analysis of United Kingdom Off-Highway Construction Machinery Market and Its Consumers Using New-Sales Data. Journal of Construction Engineering and Management, 139(05), 529–37.

Hon, C K H, Chan, A P C and Yam, M C H (2013) Determining Safety Climate Factors in the Repair, Maintenance, Minor Alteration, and Addition Sector of Hong Kong. Journal of Construction Engineering and Management, 139(05), 519–28.

Johnson, T R, Feng, P, Sitzabee, W and Jernigan, M (2013) Federal Acquisition Regulation Applied to Alliancing Contract Practices. Journal of Construction Engineering and Management, 139(05), 480–7.

Khamooshi, H and Cioffi, D F (2013) Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling. Journal of Construction Engineering and Management, 139(05), 488–97.

Marinelli, M and Lambropoulos, S (2013) Algorithmic Method for Scraper Load-Time Optimization. Journal of Construction Engineering and Management, 139(05), 459–65.

Melanta, S, Miller-Hooks, E and Avetisyan, H G (2013) Carbon Footprint Estimation Tool for Transportation Construction Projects. Journal of Construction Engineering and Management, 139(05), 547–55.

Mitropoulos, P and Memarian, B (2013) Task Demands in Masonry Work: Sources, Performance Implications, and Management Strategies. Journal of Construction Engineering and Management, 139(05), 581–90.

Poon, C S, Yu, A T W, Wong, A and Yip, R (2013) Quantifying the Impact of Construction Waste Charging Scheme on Construction Waste Management in Hong Kong. Journal of Construction Engineering and Management, 139(05), 466–79.

Salman, A, Moselhi, O and Zayed, T (2013) Scheduling Model for Rehabilitation of Distribution Networks Using MINLP. Journal of Construction Engineering and Management, 139(05), 498–509.